Case Studies
Graphite Mine
The client was in the process of constructing and developing a new mine. Since grid supply was not available, they required a reliable, continuous diesel
Waste Water Works Biogas to Energy
Beneficial use of Digester Biogas to create Electrical Energy through a scrubber system, purified and used as the primary fuel to provide electricity back into
Underground Mine Expansion Project
An Underground Expansion project to increase the annual production to 2,4 million carats, by the 2019 financial year end.
Diamonds Mine Infrastructure Upgrade
The customer planned to increase the process plant operational capacity and the existing 88kV rated infrastructure was not suitability positioned for the layout and under
Mobile Substations
The duration of power outages encountered by the client during equipment failure and routine maintenance is a major concern for the economy and safety of
7.5MVA Power Plant
The client required a complete power generation solution to ensure power availability when national load shedding is implemented. The proposed power plant had to be
Compressor
The client wanted to replace their existing compressor motor, however the delivery turn-around time and price from existing supplier could not be met
Chicken Farm
Anyone within the agricultural sector related to chicken farms, grain and fertilizer storage will know that operating a controlled climate air system can be expensive,
Mine Expansion Project
The client’s expansion project incorporated cutting-edge mining techniques, including semi-mobile in-pit crushing systems. This system allows crushing of the RoM material in the pit, and
Project Vicky
As part of the demand side management strategy the mine had to reconcile the available compressors vs. the real demand for compressed air. A decision
Synclinorium Project
The expansion of the Synclinorium Shaft at the client’s mine will extend the life of mine by 25 years. This project will also safeguard jobs
TA303 Steam Turbo Generator Set
The client has identified an opportunity to ensure energy security through the re-commissioning and upgrade of two coal fired boilers and the installation of a